Followers

Tender Results

 Tender Results of Infrastructure Projects 

##Share tender results at abhi60d@gmail.com 

Civil Engineering Books for Professionals













Gawar Construction Ltd declared as the lowest bidder for the civil construction work of Mumbai Metro’s Line-12 (Orange Line) which will connect Kalyan – Dombivali – Amandoot (Taloja) by Metropolitan Region Development Authority (MMRDA).

Mumbai Metro’s Line-12 with 19 elevated stations will be built as a 22.17 km long southern elevated extension of the partially under construction 23.53 km Line-5 (Thane – Bhiwandi – Kalyan)






No comments:

Post a Comment

Vacancy in IT sector and HR Positions

S.No Position Experience Keyskills Required Apply on 1 Senior Software E...